NJR Surgeon and Hospital Profile
Hospital

Hospital: Horton General Hospital

Oxford University Hospitals NHS Trust
SURGEONS WITH ACTIVITY RECORDED IN NJR
Surgeon NameGMC CodeSurgeon’s Activity
joseph alsousou6055867 H K
Vincent Arts3186376 H K
Nicholas Gillham2723189 E
James Owen3673388 H K
Graham Sleat6112212 H
Key :
H Hip surgery
K Knee surgery
A Ankle surgery
E Elbow surgery
S Shoulder surgery
12-MONTH PRACTICE PROFILE (1 YEAR)
Data for 1 April 2022 - 31 March 2023
Operation Type Operation SubcategoryProcedures Recorded for this HospitalNational Average
Hip Primary-21271
Elbow Primary-Fewer Than 55
           Total21+276
36-MONTH PRACTICE PROFILE (3 YEAR)
Data for 1 April 2020 - 31 March 2023
Operation Type Operation SubcategoryProcedures Recorded for this HospitalNational Average
Hip Primary-94633
Elbow Primary-Fewer Than 512
           Total94+645
HIPS
PATIENT IMPROVEMENT AND OUTCOMES

This information display shows you how this hospital compares to the national rates for a range of patient improvement and outcomes measures used to demonstrate quality in joint replacement surgery. Against each measure you will be able to see whether this hospital is performing better than expected, within the expected range or worse than expected for this type of surgery. This hospital is represented on the chart by the black marker ().

It is important to note that the types of patients a hospital treats and the procedures it carries out can explain variation in patient outcomes after surgery. Please click on the “How to interpret this chart” button for further information.

 
Patient improvement

Patient improvement, featured in this chart, looks at three measures of patient-reported outcomes that are routinely assessed following hip/knee replacement in England. This information is not currently collected in Wales, Northern Ireland, the Isle of Man, Guernsey or the independent sector and as a result, no data is available to display.

The measures are referred to using their technical names 'Oxford hip/knee score', 'EQ-5D' and 'EQ-VAS' click here for a non-technical introduction to these.

Data for 1 April 2022 - 31 March 2023


Click on the   to find out more about the quality measure and its source data
 

Patient Reported Improvement MeasureThis Trust Patient Records AnalysedTrust Avg Health GainNational Avg Health Gain
Oxford hip ScoreNo Data Available--
EQ-5DNo Data Available--
EQ-VASNo Data Available--
 

Patient outcomes

Patient outcomes, featured in this second chart below, looks at mortality and revision. Please click on the “How to interpret this chart” button for further information including additional notes on factors that may affect the results shown including whether the hospital is providing a full and accurate submission of first-time joint replacement and revision operation data to the NJR.

Data for May 2013 - May 2023


Click on the   to find out more about the quality measure and its source data
 

Patient Outcomes Quality MeasureThis Hospital Patient Records AnalysedThis Hospital RatioNational Ratio
90 Day Mortality: Operations May18-May23As Expected60.951.00
Revision Rate: Operations May13-May23As Expected2151.031.00
Revision Rate: Operations May18-May23As Expected1391.281.00
 
ABOUT THE PATIENTS WHO WERE TREATED

This information display shows overall characteristics for first-time hip replacement patients treated at this hospital between 1 April 2003 and 31 March 2023. Against each characteristic you will be able to see whether this hospital has treated a greater or fewer number of patients of a particular type. This hospital is represented on the chart by the black marker ().

The types of patients a hospital treats can explain variation in patient outcomes after surgery. Please click on the “How to interpret this chart” button for further information.

For hospitals in England and Wales, the NJR has collected information since 2003. For Northern Ireland since 2013, for the Isle of Man since 2015 and for Guernsey since 2019.

Data for 1 April 2003 - 31 March 2023


Click on the   to find out more about the quality measure and its source data
 

Percentage Of Patients Who Were:This HospitalNational Average
Male37%40%
Under 60 years of age11%21%
Severely Obese (BMI of 35 or greater)24%13%
At higher risk of medical problems before or after Surgery (ASA 3+)35%17%
Diagnosed with conditions other than Osteoarthritis60%9%
 
USE OF ODEP RATED IMPLANTSAbout ODEP
Data for 1 April 2022 - 31 March 2023
No Implant Not ODEP rated ODEP rated
Implant typeNo. of primary procedures using an ODEP rated implantNo. of primary procedures using non ODEP rated implantNo. of primary procedures submitted without any implant details% of procedures using an ODEP rated implant
Hip stem2100100%
Hip cup2100100%
 
QUALITY OF THE INFORMATION SUBMITTED BY THIS HOSPITAL

This information display shows whether this hospital is submitting all the data they should to the NJR (compliance), whether those records have corresponding patient details (patient consent) and whether the records have a valid NHS or national patient number. This is important so that the NJR can measure how long implants last and look at other areas of surgical performance.

The display also shows a result for data entry delay. This indicates whether the hospital is submitting their information in a timely way. This is important so that the NJR can report an accurate and full picture of performance to hospitals, the surgeons who work there as well as to patients and the public.

This hospital is represented on the chart by the black marker (). Please click on the “How to interpret this chart” button for further information.

Data for 1 April 2022 - 31 March 2023


Click on the   to find out more about the quality measure and its source data
 

Quality Measure This HospitalNational Expected
Compliance (for the Trust)No Data Available--
Revision Compliance (for the Trust)No Data Available--
ConsentAs Expected86.4%90.0%
Valid NHS numberAs Expected90.9%95.0%
Time taken to enter dataWorse Than Expected49 Days30 Days
 
Window
If there is no profile for an individual surgeon it is likely to be because of concerns about the accuracy of the data originally supplied to the NJR and it has, therefore, been decided not to publish this surgeon's data.

To find out more about the NJR:

Visit our website at www.njrcentre.org.uk
© Copyright 2024 NJR